Scale your inference.
Nodiac develops, on average, 2 to 20 MW sites at distribution-level interconnections with rapid paths to power, fiber, and permits.
Bring your own pod, or take it turnkey
Energized Site
A pad-ready site with power, fiber, and permit in place. You bring your own small modular compute (SMC) pod and operate it; we retain site-level maintenance.
Turnkey
The same site plus the SMC pod, financed, installed, and operated by Nodiac: 24/7 NOC, security, and maintenance included.
The path to live capacity
Site match
We map your capacity, geography, and spec requirements against the screened portfolio.
One agreement
A single MCA with per-site schedules. Add sites without renegotiating.
Energization
Site control, utility agreement, and permits, run by a team that has done it hundreds of times. Module procurement starts in parallel.
Capacity online
Energized Site: pad, power, and fiber handed off to your team. Turnkey: pod installed, NOC live, capacity accepted.
Request a portfolio review
We will walk through available sites, interconnection status, and timelines against your procurement plan.